N+1 Redundant Backup for a Tier-III Data Center

The Challenge

A Tier-III facility needed SLA-grade redundant power with zero single point of failure.

Requirements

Redundant 1000 KVA generators, synchronization, remote monitoring, sub-10-second failover.

Deployment Timeline

5 days including site prep

Execution

Two synchronized 1000 KVA generators with paralleling controls and 24×7 remote telemetry were deployed.

Results

Seamless failover during three grid events; SLA uptime maintained at 99.999%.