Manufacturing · Noida, UP
Uninterrupted Power for a 24×7 Manufacturing Plant
The Challenge
A precision-components plant faced 6–8 hours of daily grid outages, risking production loss worth lakhs per day.
Requirements
CPCB IV+ compliant, silent, auto-changeover, fuel management for continuous 3-shift operation.
Deployment Timeline
48 hours from quote to commissioning
Execution
Jayco Power sized a 500 KVA silent DG set, installed AMF panel for auto start/stop, and set up weekly preventive maintenance plus fuel top-ups.
Results
100% production uptime, 18% lower fuel cost vs. their previous setup, and full emission compliance.